MJ's new cube space
As promised, here is a picture of that redecorating I mentioned.
This cube has had one long desk section and one short removed. All underdesk cabinet drawers have been removed. The two remaining long sections have been placed to allow side by side pair programming.
As a final addition, the floor tiling was recently added.
Good work team!
This cube has had one long desk section and one short removed. All underdesk cabinet drawers have been removed. The two remaining long sections have been placed to allow side by side pair programming.
As a final addition, the floor tiling was recently added.
Good work team!



0 thoughts:
Post a Comment